Footprint Construction
11/05/2022
08/01/2022
Fun Pool Pavilion project.
11/29/2021
Happy Holidays!
07/26/2021
One of the prouder moments I have had doing construction was hanging a historic marker plaque for this project and having my name on it. Thanks to the team and especially Laurie for making this possible.
07/26/2021
Exterior trim and overhangs painted.
07/26/2021
Updated interior pics of house.
05/23/2021
Back porch final painted. Designer Carla did a great job picking colors.
02/18/2021
Progress pictures of the back porch.
02/05/2021
I have been helping restore parts of this 140 yr old for almost a year now. Lots of long weekends but it’s been worth it. It’s a great home and it’s being preserved as an historic district.
01/06/2021
Mud room storage. First 4 sections are for coats, the last door on the right is shoe storage. Bench seat is more reclaimed lumber.
01/06/2021
Slowly working on the built-ins for our house. This is the second floor living area. There is a small sewing cabinet on the left and storage on the right.
02/08/2020
House was designed around original overhang brackets for a railroad depot in Nortonville, Ks
Click here to claim your Sponsored Listing.
Category
Website
Address
FPC
Topeka, KS
66615