CMTconstruction
02/21/2026
Will we ever see justice? I highly doubt it.
Been a while. Miss these days
05/17/2016
Tile shower we did a while ago.
10/08/2015
Retaining wall footing underway. Terrible access, all the dirt needs to be taken out with buckets. Sounds like fun, right? LOL
Time to break out your umbrellas. Looks like a pretty good storm is going to hit us early next week.
CMT Construction will be closed until September 15th. Have a wonderful week.
08/08/2015
Stamped concrete pool deck.
05/17/2015
We just beat the rain on this concrete pour.
05/17/2015
Added touch to the pergola bases.
Summer is here, make sure you drink lots of water and stay hydrated.
Click here to claim your Sponsored Listing.
Category
Contact the business
Address
4249 Florence Street
Simi Valley, CA
93063