Floating Bridge Brewing
11/17/2022
At last!
Curious about the new sidewalk?! Check out this handy dandy SDOT diagram of the anticipated upgrades at our corner and at 9th Ave NE.
——
Per SDOT:
Route 44 Transit-Plus Multimodal Corridor
NE 45th St and 8th Ave NE – 9th Ave NE
Starting as soon as November 14, crews will begin sidewalk and crossing work at 8th Ave NE. Work includes sidewalk upgrades, pole foundations, road panels, signal pole installation, electrical, and crosswalk installation. Once complete, work will continue to 9th Ave NE.
03/25/2021
Here’s the lineup for the weekend!
Click here to claim your Sponsored Listing.
Category
Contact the business
Address
722 NE 45th Street
Seattle, WA
98105