Timeline Design+Build

Timeline Design+Build

Share

When Matthew Harrigan began Timeline Design in 1990, his goal was to organize every detail of each project prior to commencement. This process allows Timeline Design to deliver a top quality product in the least amount of time, with the least disruption to client's lives. Today, the entire staff at Timeline Design is committed to fulfilling his mission of "On Time and on Budget." Timeline Design i

05/27/2026

🏡 Planning a remodel, addition, or custom home in Los Gatos? Before construction begins, understanding the residential permitting process can make a major difference in how smoothly your project moves forward.

From zoning requirements and plan reviews to approvals and inspections, every detail impacts project timelines. Working with an experienced residential design team familiar with Los Gatos regulations can help homeowners navigate requirements more efficiently while avoiding unnecessary setbacks. ✨

A well-prepared project not only simplifies permitting but also creates a smoother experience from design through construction.

Learn more about residential permitting considerations in Los Gatos: https://tldesign.net/residential-permitting-los-gatos/

04/08/2026

Driven by the geometry of the home, this space explores contrast through material, color, and form.

The result is a kitchen that feels layered, expressive, and highly considered in every detail.📐
 
In collaboration with Tobin Dougherty Architects and SieMatic.

Want your business to be the top-listed Home Improvement Business in Saratoga?
Click here to claim your Sponsored Listing.

Address


14401 Big Basin Way
Saratoga, CA
95070

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm