ioKinetic
All of our testing is conducted by our "hands-on" engineers and scientists. The same experts design the testing, approve the test results, analyze the data and evaluate your process. We track and help develop advances to existing methods. We stay on top of changes to regulations, standards and RAGAGEP so you don't have to. As users of the data, we are in a unique position to help you define test p
05/14/2026
On February 22, 1993, several tons of toxic chemicals were released when a runaway reaction occurred at a pharmaceutical manufacturer in Germany.
Key Safety Issues:
• Missing Process Safety Information (PSI)
• Lack of interlocks & alarms
• Serious structural, environmental, and operational failures
• No process hazard recognition
• Lack of written safety procedures
Read the BARPI incident report for important lessons on chemical safety and stay safe. https://bit.ly/4dq3rKG
ARC data is used for reactive system process characterization, pressure relief system design, defining safe upper and lower limits, and more. Take advantage of 20% off* for a limited time from ioKinetic. https://bit.ly/3ErxgbN
For a corporation, a major crisis threatens a company’s reputation, a specific product line, an entire manufacturing operation, or even a company’s survival. Watch this PStv® presentation by David Blake on the 3 critical attributes of crisis management. https://bit.ly/3lM0ttO
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
93 Stiles Road #204A
Salem, NH
03079
Opening Hours
| Monday | 9am - 5pm |
| Tuesday | 9am - 5pm |
| Wednesday | 9am - 5pm |
| Thursday | 9am - 5pm |
| Friday | 9am - 5pm |