MAX 360
05/12/2026
Clashes found in the field, budgets that surprise you, trades sequencing on site instead of in the model - these arenโt bad luck. Theyโre what happens when BIM, schedule, and cost donโt talk to each other. ๐๏ธ
Swipe through - this oneโs worth reading before your next project kicks off.
Tag an AEC firm that needs to hear this.
05/08/2026
How do you eliminate electrical clashes before construction even starts? โก
In tight infrastructure spaces, one mistake = delays, rework, and added costs.
For this North Charleston transit project, we coordinated electrical power, lighting, and low-current systems inside compact crew + bus shelters - where precision is everything.
Using our BIM and VDC workflows:
โข Built detailed 3D models
โข Ran full clash detection
โข Coordinated every system before install
The result:
โ Zero clashes โ Zero delays โ Full confidence on-site
This is what smart coordination looks like. ๐๏ธ
๐ DM us to see how we can support your next projects.
๐ North Charleston, SC
๐๏ธ Infrastructure
04/22/2026
Who really benefits from BIM? The answer might surprise you. ๐
Hereโs how each player wins:
๐๏ธ Architects
Visualize designs with precision, catch coordination issues early, and deliver projects that match the vision.
โ๏ธ Engineers
Enhanced collaboration, less rework, and smarter designs delivered at every stage.
๐๏ธ General Contractors
Better coordination, less rework, smoother delivery - on time and on budget
๐ง Trade Contractors
Detailed shop drawings and clear sequencing mean faster installs and cleaner ex*****on in the field.
๐ข Owners & Developers
Full visibility from concept to closeout. Smarter decisions, fewer delays, higher-value assets.
๐ญ Manufacturers & Suppliers
Precise, construction-ready digital content that gets your products specified, adopted, and integrated faster.
When BIM is done right, everybody wins.
MAX 360 makes sure of it.
04/20/2026
The best-built projects start with the most accurate drawings.
Every line, every dimension, every detail - done to your standards. MAX 360 delivers CAD Drafting and Shop Drawings your team can build from without question.
๐ DM us to get started.
04/07/2026
The most expensive mistake in construction? Ordering materials without accurate takeoffs. ๐
For this residential project, we delivered detailed quantity takeoffs covering:
๐ฒ Exterior fiber cement siding
๐ฒ Trims & soffits
๐ฒ OSB sheathing - walls, roof & subfloor
The result? Zero guesswork. Precise material estimates. A budget that actually holds. ๐ฏ
Accurate takeoffs arenโt just paperwork - theyโre the foundation of a project that finishes on time and on budget.
๐ฉ DM us to get started on your next project.
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
177 E Colorado Boulevard Suite 200
Pasadena, CA
91105