Equity Maintenance Group
04/28/2026
This project involved the complete removal of existing pavers and deteriorated concrete to prepare the area for a durable upgrade. The site was excavated to a depth of 4 inches to allow for proper base preparation and structural support.
Reinforcement was installed using rebar to enhance strength and longevity, followed by the placement and finishing of new concrete. The result is a solid, long-lasting surface designed to withstand regular use while improving the overall functionality and appearance of the space.
04/03/2026
Our team completed a repainting and restoration project on faded bollards, revitalizing their appearance and enhancing on-site safety. The refreshed coatings improve visibility for both pedestrians and vehicles while protecting the bollards from ongoing wear and environmental exposure.
A simple upgrade that delivers both functional value and a cleaner, more professional look to the property.
Click here to claim your Sponsored Listing.
Contact the business
Telephone
Website
Address
7575 Dr. Phillips Boulevard Suite 390
Orlando, FL
Opening Hours
| Monday | 8am - 6pm |
| Tuesday | 8am - 6pm |
| Wednesday | 8am - 6pm |
| Thursday | 8am - 6pm |
| Friday | 8am - 6pm |