Dominick R. Pilla Associates
04/24/2023
Strength, beauty + reliability //
Progress on the new Activities Building at Camp Kaufmann in Holmes, NY. Open year-round, the facility stretches over 425 acres and welcomes Girl Scouts from across New York City.
DRPILLA is providing structural analysis + engineering design for the lateral force resisting system for the proposed 12,000-square-foot prefabricated glulam structure.
The project is scheduled for completion in September 2023.
02/23/2022
Renovations to this existing 12,000-square-foot Oyster Bay home originally built in 1918
We provided structural engineering design for the installation of a new elevator, reframing of the existing exterior balconies and existing roof system to accommodate a new slate roof, addition of a new covered pool porch, and interior modifications throughout.
(Did we mention this home backs right up to the greens of the Piping Rock Country Club? Can you tell we're ready for golf season again? ⛳️🙌🏻)
02/07/2022
Top to bottom renovation . . INSIDE LOOK: The eye travels up and down the vertical lines and planes in this kitchen, which stays streamline but grounded by its darker half. Dark focal points creep up on the omnipresence of all-white modern design, creating a beautiful harmony throughout the home.
01/31/2022
The renovation accommodates more than 5,600 square feet of new exhibition spaces spread across the first three levels.
THE DETAILS: A wall on the second floor was removed to create a dramatic overlook into the sky lit, 22-foot-tall exhibition space. The basement + top three floors accommodate art handling, offices, private viewing rooms + an artist studio.
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
143 Main Street
Nyack, NY
10960
Opening Hours
| Monday | 9am - 5:30pm |
| Tuesday | 9am - 5:30pm |
| Wednesday | 9am - 5:30pm |
| Thursday | 9am - 5:30pm |
| Friday | 9am - 5:30pm |