Enviroprobe Integrated Solutions

Enviroprobe Integrated Solutions

Share

06/10/2026

. Our D-50 and B-57 crews have been drilling some deep geotechnical borings in tough heaving sand conditions using augers, casing advancers, and NQ coring while using environmentally friendly hole stabilization fluids. Access isn’t ideal but with the right equipment they are getting it done safely. Great job men!

05/22/2026

. Our Geoprobe 7822DT crew is performing geotechnical drilling (auger, SPT, and rock coring) at a proposed high school ball field for a future retaining wall and several light structures. They are working between rain and thunderstorms (we don’t work if lightning is within 15-20 miles). Cab up men as needed to stay safe!

05/22/2026

. Our Geoprobe 8150LS Sonic rig and crew has been installing 8” casing (10” Sonic), doing 6” Sonic into bedrock (up to 140 ft), performing soil sampling, installing Monitoring Wells, and installing Lysimeters. They have to also collect any cuttings and return fluids. This is a highly challenging project and our guys are crushing it!

Want your business to be the top-listed Contractor in Nitro?
Click here to claim your Sponsored Listing.

Category

Telephone

Address


630 Cross Lanes Drive
Nitro, WV
25143

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm