DCCM
06/03/2026
From Brazoria County, Texas, this project highlights the infrastructure work that helps bring renewable energy online.
DCCM provided civil engineering design, permitting, and construction support for the Pythias Solar Substation, a 138 kV–34.5 kV facility developed to interconnect a utility-scale solar farm into the client’s transmission network. The substation serves as a critical grid-tie facility, enabling the delivery of renewable energy into the regional power system.
Scope included site layout, grading, and stormwater management design, along with preparation of construction plans and specifications. DCCM coordinated with Brazoria County and local drainage authorities to support permitting approvals and compliance with environmental and drainage requirements. The design incorporated a detention system and erosion control measures to protect surrounding infrastructure and natural resources. During construction, DCCM provided engineering support, responded to contractor inquiries, and coordinated survey and layout data.
Learn more about the project and how DCCM supports communities nationwide: they https://dccm.com/portfolio/pythias-solar-substation/
Click here to claim your Sponsored Listing.
Category
Website
Address
1801 Post Oak Boulevard, Suite 325
Houston, TX
77056
Opening Hours
| Monday | 8am - 5pm |
| Tuesday | 8am - 5pm |
| Wednesday | 8am - 5pm |
| Thursday | 8am - 5pm |
| Friday | 8am - 5pm |