Kb Contractors LLC
07/07/2026
Almost completed with this 60,000 SF warehouse in Northern Virginia. Scope consisted of coating removal, joint filling, patch and repairs - polished to 200 grit π₯
Our team has had a great year so far and we look forward to ending the year strong πͺπ»
05/21/2026
Costar Richmond Virginia phase #1 completed last night. This job site is packed with other trades, materials and lots of coordination getting materials inside. Our team prepped, primed and poured an average of 2β of .sika Moisture Mitigation SLU. This floor had to meet strict floor tolerance to meet up with the ceramic tile and meet the floor tolerances to install wood flooring throughout. Detailed floor surveys and pin setting required to get this floor where it needed to be. Weβre starting phase #2 tonight.