Primary Engineering
02/09/2026
Primary Engineering designed the MEP systems for the new Fortville Elementary School in Fortville, Indiana, that opened for grades K-4 for the 2025-2026 school year. We designed mechanical systems to enhance energy efficiency, improve fault tolerance in equipment failures, improve space comfort, and reduced overall project costs. For classrooms, we specified using vertical unit ventilators to control individual space conditions and to reduce the fan energy needed to condition the building by using hydronic piping to distribute heating and cooling to each unit with minimal transport energy use. We also designed energy-efficient lighting systems and a power distribution system for flexibility and growth over the life of the new facility.
Architects Fortville Elementary School
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
Fort Wayne: 2828 Lake Avenue; Indianapolis: 9785 Crosspoint Boulevard, Ste. 103
Fort Wayne, IN
46805
Opening Hours
| Monday | 8am - 5pm |
| Tuesday | 8am - 5pm |
| Wednesday | 8am - 5pm |
| Thursday | 8am - 5pm |
| Friday | 8am - 5pm |