CGRS

CGRS

Share

began its environmental compliance journey in 1987 as a leak detection services company for owners and operators of underground petroleum tank systems. Forthcoming EPA regulations—40 CFR 280—were to require regular testing of UST systems for leaks. The founder and current President/CEO of CGRS bought some tank and line testing equipment and then hit the road. The industry and the testing equipment

Photos from CGRS's post 06/08/2026

🏥At a local hospital in California, CGRS recently completed a critical repair of the facility’s underground storage tank (UST) system supporting its emergency generators.

Understanding the importance of uninterrupted power in a healthcare environment, we first coordinated the installation of a temporary aboveground storage tank (AST) system to ensure continuous fuel supply throughout the project.

From there, our team marked the excavation area through DigAlert/USA and secured the required dig ticket. We also performed a Ground Penetrating Radar (GPR) survey to identify any unmarked private utilities prior to excavation.

Our scope of work included:
• Replacement of a failing tank sump
• Replacement of associated piping and containment components
• Installation of a new, code-compliant, liquid-tight double-wall sump
• Full system testing, including Enhanced Leak Detection (ELD)
• Verification of system integrity, continuity, and regulatory compliance

Once repairs and testing were completed, we safely transitioned the system back to the UST and removed the temporary AST setup—without disruption to hospital operations.

This project was a great example of the importance of planning, compliance, and precision when working on mission-critical infrastructure. If you have concerns about your UST system integrity or compliance, feel free to reach out.

06/05/2026

HIRING: Construction Project Estimator – Fueling Systems ⛽🦺📐
Ready to take your field experience off the jobsite and into project planning?

We’re looking for someone with fueling system construction experience who is are ready to step into an estimating role. If you understand how projects come together in the field, we’ll teach you how to build them on paper.

This is your opportunity to grow your career without leaving the industry behind.

What you’ll be doing:
• Supporting project estimates for fueling system construction
• Translating field knowledge into accurate project scopes and costs
• Working with operations teams to set projects up for success
• Learning estimating tools and processes

What we’re looking for:
• Hands-on experience in fueling, UST/AST, or related construction
• Strong understanding of how projects run in the field
• Willingness to learn and grow into an estimating role
• Detail-oriented with a problem-solving mindset

What you get:
• Competitive pay (based on experience)
• Full benefits
• Long-term career growth
• A team that values your field experience

Your experience builds projects.
Now build your future with CGRS.

📩 Apply at: [email protected]
🌐 Careers: www.cgrs.com/careers

Full Job Description:https://cgrs.com/wp-content/uploads/2026/05/Construction-Project-Estimator_2026.pdf

Want your business to be the top-listed Engineering Company in Fort Collins?
Click here to claim your Sponsored Listing.

Telephone

Address


1301 Academy Court
Fort Collins, CO
80524

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm