DSK construction
From site prep to slab pour — foundation work in progress.
At DSK Construction, we support builders with dependable Shell and Equipment services, delivering safe, organized, and high-quality results at every stage of construction.
DSK CONSTRUCTION CORP
Equipment | Shell | Drywall
CGC 1539151
954.651.0449
02/27/2026
Frame it. Hang it. Finish it. Repeat. Happy Friday!
DSK CONSTRUCTION CORP
Equipment | shell | drywall
CGC 1539151
954.651.0449
02/24/2026
Another day. Another roof set. On to the next (hopefully not in Miami Beach 😅)
DSK CONSTRUCTION CORP
Equipment | shell | drywall
CGC 1539151
954.651.0449
02/23/2026
Our team executed this foundation and slab on grade with detailed formwork, reinforced steel placement, and precision concrete pumping to ensure structural integrity from the ground up.
From equipment coordination to final surface finishing, every phase was handled with accuracy, safety, and efficiency to support the builder’s schedule.
DSK CONSTRUCTION CORP
Equipment | Shell | Drywall
CGC 1539151
954.651.0449
02/12/2026
Drywall work in progress at this garage project in Davie.
Progress like this is where quality truly begins.
DSK CONSTRUCTION CORP
Equipment | Shell | Drywall
CGC 1539151
954.651.0449
02/10/2026
This was part of the construction process for a guest house in Delray Beach, where our Drywall Division supported the build with precise interior work.
From framing and insulation to drywall installation and finishing, our team focused on accuracy, coordination, and clean ex*****on at this stage of the project.
DSK CONSTRUCTION CORP
Equipment | Shell | Drywall
CGC 1539151
954.651.0449
02/10/2026
We’re officially doing our own steel fabrication in-house. From the initial shop drawings to the final install, DSK CONSTRUCTION is your one-stop shop for structural excellence. Let’s build something solid together.
DSK CONSTRUCTION CORP
Equipment | shell | drywall
CGC 1539151
954.651.0449
02/03/2026
152 cubic yards of concrete & 21,000 lbs of rebar later the grade beams / structural slab combo are poured and done. The job is now ready for our friends precast walls and floors. We’ll be back to fly trusses and start helical piles for site wall in a few weeks.
DSK CONSTRUCTION CORP
Equipment | shell | drywall
CGC 1539151
954.651.0449
01/27/2026
Davie project progress.
Selective demolition, structural shoring, and foundation work underway, each step carefully executed to prepare for the next phase. 🚀🚀🚀🚀
01/22/2026
Another phase completed ✔️
Exterior work wrapped up and ready for the next step.
Equipment | Shell | Drywall
CGC 1539151
01/08/2026
Most people think concrete is the job.
It’s not.
What actually matters happens before the pour:
the prep, the reinforcement, the alignment, and the planning that no one sees once it’s finished.
At DSK Construction, we focus on what holds everything together — not just what looks good at the end.
💬 This step is the difference between lasting and failing.
📩 DM us to build it right from the ground up
Click here to claim your Sponsored Listing.
Category
Telephone
Website
Address
7020 Sw 22nd Court Unit C&d
Davie, FL
33314
Opening Hours
| Monday | 8am - 5pm |
| Tuesday | 8am - 5pm |
| Wednesday | 8am - 5pm |
| Thursday | 8am - 5pm |
| Friday | 8am - 5pm |