Getty Construction

Getty Construction

Share

06/03/2026

A lot of work goes into what you don’t always see!

80,000 pounds of rebar were installed along with a 500 yard concrete pour.

Solid foundations make all the difference, especially when supporting a 240,000 lb windmill generator.

Photos from Getty Construction's post 05/29/2026

We broke ground this week on our new Crosslake model home!

The views of the lake are stunning and it truly feels private being surrounded by so many beautiful trees.

Warm rustic materials, clean modern details, and thoughtfully designed spaces will come together to create a home that feels elevated, inviting, and connected to the cabin & lake lifestyle.

05/26/2026

Demo at the Woodbury main level remodel is complete!

With minimal structural, plumbing, electrical or framing changes we get to jump right to putting the space back together.

First up: Hardwood flooring patching & re-finishing followed by installation of two new fireplaces & roughing in the A/V updates.

Photos from Getty Construction's post 05/24/2026

We are starting the preliminary design process for a Minneapolis condo primary bathroom and that has us reminiscing about the last Minneapolis condo bathroom we completed!

It's been nearly 6 months since we turned this space back over to the owner - time flies!

Photos from Getty Construction's post 05/20/2026

Projects like this come together through thoughtful planning and attention to detail at every stage.

Clean lines, balanced materials, and a fireplace room designed to anchor the entire open concept living space.

This space used to be a porch but now is such an integral part of the home it's hard to believe it wasn't like this originally!

Photos from Getty Construction's post 05/11/2026

Behind the scenes of the furnishing install at our main level remodel in Minnetrista!

Over two days we had four furniture deliveries, the stairway runner installed, fireplace mirrors installed, window treatments installed and the final light fixtures we were waiting on put up. Frames and artwork got installed and wrapped up the final day with decor & styling.

Everything came together beautifully and we cannot wait to share the final photos!

Want your business to be the top-listed Engineering Company in Buffalo?
Click here to claim your Sponsored Listing.

Category

Telephone

Address


9679 Division Street E
Buffalo, MN
55313

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm