Successfully installed a 28KW Hybrid Solar System featuring:
✔ Dual Inverters ( 15KW + 8KW)
✔ 580W High-Efficiency Longi Panels
✔ Advanced Sunwoda Lithium Battery Backup
✔ Galvanized Elevated structure
Built for maximum performance, reliability, and long-term savings.
At NewTech Solutions we are fully committed to provide top Notch Solar solutions with best after sales services.
Contact for your Solar
📞 0305-4431413
Or
📞0300-4981382
Lahore, Pakistan
Pakistan has officially shifted from net metering to net billing.
Only solution of this is Hybrid System.
Looking for hybrid solution?
Call/Text : 0305-4431413
NewTech Solutions for a reliable system design.
*Pakistan has moved from “net metering” to “net billing”.*
Solar is now a cost-saving tool, not an income generating asset.
Here is what new policy states now.
*NEPRA Prosumer Policy 2026:*
Pakistan has officially replaced the old Net Metering Regulations 2015 with the Prosumer Regulations 2026. This changes how solar owners sell electricity to the grid.
*1. Net Metering is Replaced with Net Billing*
*Old system (2015):*
• Units exported = units imported
• One-to-one adjustment (kWh vs kWh)
*New system (2026):*
• You now sell units at National Average Energy Purchase Price (NAEPP)
• You buy units at your normal DISCO tariff
• This is financial net billing, not unit-based netting.
*2. Export Rate is Lower*
• Export price is no longer retail.
• It is linked to national average energy purchase price (bulk power cost).
• Means payback period becomes longer.
*3. Existing Solar Users*
If you already have net metering:
• Your current agreement stays valid till expiry.
• Billing already shifts to national average price.
• On renewal, you fully move to new prosumer model.
*4. Maximum System Size Rule*
• Your solar capacity cannot exceed your sanctioned load.
• Example:
10 kW sanctioned load → Max 10 kW solar allowed.
*5. Transformer Limit Introduced*
• If a transformer is already loaded 80% with solar, new applications can be rejected.
• This gives DISCOs legal ground to stop approvals.
*6. Load Flow Study Now Mandatory*
• For systems 250 kW and above, a professional grid study is compulsory.
• Must be done by PEC-registered consultant.
*7. Agreement Term Fixed*
• New solar contracts are:
• 5 years only
• Renewable every 5 years
• Earlier it was effectively open-ended.
*8. NEPRA Approval Still Required*
• Every prosumer must get:
• DISCO agreement
• NEPRA concurrence certificate
• Any technical modification requires fresh approval.
*Strategic Reality for Solar Owners*
Solar is still worth it, but the model has changed:
*Best use case now:*
• Design systems for self-consumption
• Use batteries or daytime loads
• Stop oversizing for export
*Worst idea now:*
• Installing large systems purely to sell to grid.
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Address
TNT Aabpara Housing Scheme, Raiwind Road Lahore. , TNT Aabpara Housing Scheme, Raiwind Road Lahore
Lahore
54000
Opening Hours
| Monday | 09:00 - 18:00 |
| Tuesday | 09:00 - 18:00 |
| Wednesday | 09:00 - 18:00 |
| Thursday | 09:00 - 18:00 |
| Friday | 09:00 - 18:00 |
| Saturday | 09:00 - 18:00 |