DaMar Engineering

DaMar Engineering

Share

Photos from DaMar Engineering's post 21/04/2026

On Going...

installation of 9.76KWp Hybrid System

6KW Deye Hybrid Inverter
16 Pcs 610W OSDA Bi-Facial Solar Panels
16KWh SRNE LIFEPOโด Battery

17/04/2026

LUZON GRID ALERT STATUS
as of 16 April 2026, 5PM

๐˜๐ž๐ฅ๐ฅ๐จ๐ฐ ๐€๐ฅ๐ž๐ซ๐ญ
4:00PM-10:00PM

Capacity - 12,223MW
Demand - 11,966MW

35 plants are on forced outage; while 14 are running on derated capacities, for a total of 5137.2MW unavailable to the grid.

Factors that contributed to the raising of yellow alert:
- tripping of EERI 1, 2, 3; Ilijan Block A; and Ilijan Block B
- unavailability of hydro plants (Magat 1, 2, 3, 4)

A yellow alert is issued when the operating margin is insufficient to meet the transmission gridโ€™s contingency requirement.

Photos from DaMar Engineering's post 29/03/2026

Successfully Installed 5.68KWp Hybrid System

6kw Srne Hybrid Inverter
8x 710W OSDA Bi-Facial Solar Panels
16kwh SRNE LiFePoโด Battery

Thank You Sir Jaydee & Family.

29/03/2026

Thank you, Judge for availing our 6kwh Hybrid Solar PV System!

Perfect for this summer season!

Thank you for trusting Damar Engineering!

For inquiries, please message us. We are operated by licensed engineers, certified TESDA electricians and IT.

Want your business to be the top-listed Engineering Company in Pili?
Click here to claim your Sponsored Listing.

Telephone

Website

Address


Brgy Cadlan
Pili
4400