ITNT

ITNT

Share

02/12/2025

Job Announcement

ITNT Company is an active company in the technology and networking sector, located in Muscat, Oman. To complete its expert staff, it needs a technical person in the customer service department.
The candidate must have the following characteristics:
- Familiar with hardware and software of wireless and wired networks
- Familiar with the settings and configuration of various Mikrotik routers
- Having an official certificate from Mikrotik is essential.
Note: candidates send their applications and CV to [email protected]

20/04/2024

I'm attending Oman Sustainability Week 2024 - Oman's national event for Future Energy, Power, Water, Waste, Environment and Society. Register for your free ticket and join me!

21/01/2024

Networking Project in Oman

One of the most important parts of setting up a network is the passive part of the network. which only includes services such as installation, network infrastructure implementation, and network and server equipment setup, and has nothing to do with the configuration stage.

The steps of passive network implementation include: visit, design, implementation and measurement. The network infrastructure is very important, so choose the highest quality equipment to implement the project.
Passive network implementation steps
Visit the project
The first step is to visit the project. First, information technology experts who specialize in the passive field will visit the project site.
To get basic information for the design and implementation of the project by visiting. Then, according to the visit, they consider a pre-invoice for the project.
Network infrastructure design
At this stage, the project is fully designed. Network infrastructure mapping is very important. Because all the conditions of the environment must be fully measured and a basic map that is standard must be designed.
The importance of the design part is because, in many cases, it is not possible to change it after performing the passive network services.
Implementation of the operation
After completing the above steps, it is time to perform the cabling. Cabling is carried out in two ways: exposed or embedded. If the cable laying is done face-to-face, it is necessary to do ductwork in order not to damage the cables.
It is better to use the best type of cable. After the cabling, the rack should be installed and arranged and actions such as patch, switch, router, server and network equipment should be installed inside the rack. Finally, after completing these steps, all nodes, sockets and keystones are installed.
Network testing and measurement
The last step is network testing. After completing all the above steps according to the standards and the designed plan, it is time to test the network signal.
In this step, all network nodes are tested for being healthy to establish communication. This part is done by experts and with network cable testing tools.

What is done in passive network services?
• Network design and map
• Installation of network equipment such as: switch, router, etc.
• Server room design according to the standard
• Cabling and trunking
• Optimization of old infrastructure
• Implementation of the network and implementation of the project plan
• Arrangement of all kinds of racks
• Installing ups
• Ducting of cables
• Rack installation and server room
• Setting up the center
• Installing sensors and smart equipment to control the network and infrastructure
• Installing a fire alarm system for the server room
Finally, deliver the complete map of the project and the completed works to the employer so that he knows about the completed works and his network map. Passive network service support is very important to maintain the quality and efficiency of services. Perhaps poor quality services will annoy the employer and the staff of the complex. ITNT Company has considered various support panels that include all services due to its awareness of these factors and for the well-being of your loved ones. To make you feel satisfied.

How much does it cost to set up a company or organization's network?
These costs depend on several factors, including the type of network that is set up, the extent of the network, the dimensions of the location and many other factors. A wireless network will cost less than a wired network. For this reason, the determination of such costs is done by a passive expert after visiting the project site and preparing a map. A major part of the cost of setting up a computer network is spent on purchasing passive network equipment, which will have different costs depending on the type of cable, switches, routers, etc.
Factors affecting the cost of passive network implementation
1. Quality of equipment
2. The size of the building
3. Location of the project
4. Cabling
5. Required bandwidth
6. Network type
Conclusion
The cost of passive network implementation is the most important issue for starting a project. Many projects are not implemented due to high cost estimates.
The quality of passive implementation plays a very important role in the standardization of the network of a company or organization. No matter how standard and principled your computer network infrastructure is, you will have the highest efficiency.

21/01/2024

ONLINE FOOD ORDERING AND AUTOMATIC WI-FI MARKETING SYSTEM FOR RESTAURANTS
IDEAL SOLUTION FOR YOUR RESTAURANT

The Restaurant System can help you increase your earnings by an average of 30%, using a combination of two next-generation software. The system combines the WiFi network as a marketing channel with software for ordering and booking tables. The system also allows the display of video ads and automatically sends special offers at a defined time interval, thereby increasing revenue

The system collects data and surveys, which provide objective feedback on guest satisfaction. A guest can give consent to receive intermittently emails containing discounts, coupons and the offers of your partners for advertising purpose When a guest first connects to the restaurant WiFi network, they will receive a welcome email.

When a guest leaves the restaurant, the system can send a short survey asking whether the guest is satisfied with the service in order to react to possible complaints.After a month, the system can send a pre-arranged email to remind the guest to come again.

After 60 days, you can send a coupon that the guest will need to use within the time limit. You can customize or create different email templates and configure the sending intervals. If necessary, when you expect a smaller number of guests, send a promotional email with a special discount on that day and increase revenue.

Photos from ITNT's post 18/01/2024

Design and implementation of wireless networks to deliver optical fiber internet to remote villages

18/01/2024

Design and implementation of wireless networks to deliver optical fiber internet to remote villages

Photos from ITNT's post 18/01/2024

-Implementation of network projects (wireless and wired)
-Setting and configuration of all types of network management routers
-Network management software
-Providing satellite internet for areas outside the scope of optical fiber, remote islands and deprived areas

Want your business to be the top-listed Business in Muscat?
Click here to claim your Sponsored Listing.

Telephone

Address


New Work Business Center
Muscat

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Sunday 09:00 - 17:00