CEDB Hydropower Development Company Limited
About Us
CEDB Hydro Fund Limited (CHF), a public limited company incorporated under the prevalent laws of Nepal on Mangsir 15, 2066 (November 30, 2009). CEDB Hydro Fund Limited (CHF) was founded by the then Clean Energy Development Bank to provide equity investment for hydropower projects to meet energy needs of the nation. It has got three hydropower projects in operation and four projects at con
Dear Shareholders,
CEDB Hydro Fund Ltd is issuing the Right Share of 1:0.30 i.e. 100 shares equal to 30 shares of Rs.100 each from 2073/05/18 B.S. All Shareholders are kindly requested to fill the form of Right Share within 2073/05/18 to 2073/06/21.
Application Form avails at www.chf.com.np
05/08/2016
Projects under Development
1. Lower Khare Khola Hydropower Project (11MW).
2. Dordi-I Hydroelectric Project (10.3MW)
3. Rukum Gad Hydropower Project (5MW)
4. Kasuwa Khola Hydropower Project (45MW)
For more details about the projects,
please visit www.chf.com.np
Projects under Operation
1. Syange Mini Hydropower Project
Syange Mini Hydropower project which is located in Taghring VDC in the northern part of Lamjung District, has an installed capacity of 183 KW capacity and was completed in 2001 (2058 B.S). This project supplies power to Nepal Electricity Authority (NEA) through the national grid with inter-connection to the Udipur Substation of NEA. The project has already repaid its loan in February 2011. Syange Bidyut Company Limited, which has developed and is currently operating this project, is a subsidiary of CEDB Hydro Fund Limited.
2. Radhi Small Hydropower Project
Radhi Small Hydropower Project, which is located in Ghermu VDC of Lamjung district, has an installed capacity of 4.4 MW. The generation license of this project was obtained on Baishakh 28, 2068. The financial closure for the project was completed in September 2011 with a consortium of five banks comprising Bank of Kathmandu (Consortium Lead), Kumari Bank Limited, Sanima Bank Limited, Janata Bank Nepal Limited and Global Bank Limited. The various contracts for the civil, electromechanical and hydro-mechanical components of the projects have been awarded. The construction work has been started at the project site. The generated power from the project will be evacuated through the 33 KV transmission line to Chipalabesi Substation which is 200m from the power house. Radhi Bidyut Company Limited, which has the development rights of this project, is a subsidiary of CEDB Hydro Fund Limited. Radhi Bidyut Company Limited is going for Initial Public Offering (IPO) in near future.