Ryan Home Invods
12/04/2026
๐ RM1,400 sebulanโฆ dah boleh miliki ๐๐ฎ๐ฆ๐๐ก ๐๐๐๐ฏ๐ข๐๐ฐ di ๐๐ฎ๐๐ง๐ญ๐๐ง? ๐คฏ https://wa.link/vq0amj
๐ Dari RM380K sahaja (bulanan RM1,400+)
๐ ๐๐๐% ๐ฉ๐ข๐ง๐ฃ๐๐ฆ๐๐ง (tertakluk kelulusan)
Ramai ingat rumah tepi pantai mesti mahalโฆ
Sebab tu ramai lepaskan peluang. Tapi sekarang peluang ni dah ada.
๐ฅ๐๐๐ง๐๐ฉ๐ ๐ฉ๐๐ฅ๐๐๐ฎ๐ซ ๐ซ๐๐๐ฎ๐ญ ๐๐๐ฅ๐ข?
1๏ธโฃ ๐๐๐% ๐๐จ๐๐ง โ ๐๐๐ง๐ฉ๐ ๐๐จ๐๐๐ฅ ๐๐๐ฌ๐๐ซ
Tak perlu keluarkan banyak duit sendiri.
๐ก Penyewa bantu bayarkan ansuran.
2๏ธโฃ ๐
๐ฎ๐ฅ๐ฅ๐ฒ ๐
๐ฎ๐ซ๐ง๐ข๐ฌ๐ก๐๐ Konsep Mediterranean ๐ฟ Macam Santorini.
Tak perlu renovate, terus boleh sewa / duduk.
3๏ธโฃ ๐๐๐ ๐๐ฉ๐๐ซ๐๐ญ๐จ๐ซ ๐๐จ๐ฆ๐๐ฌ๐ญ๐๐ฒ ๐๐๐ซ๐ฃ๐๐ง๐๐ฆ๐
Tak nak pening manage? https://wa.link/vq0amj
๐ Operator uruskan
๐ Atau duduk sendiri ~ fleksibel
4๏ธโฃ ๐
๐๐๐ข๐ฅ๐ข๐ญ๐ข๐๐ฌ ๐๐๐ฌ๐๐ซ & ๐๐๐ง๐ ๐ค๐๐ฉ (Bukan Biasa)
โ Wedding space
โ Event hall
โ Ninja obstacle
โ Aktiviti tarikan crowd dll ...
๐ Ini yang tarik demand & sewaan
5๏ธโฃ ๐
๐ซ๐๐๐ก๐จ๐ฅ๐ (๐๐๐ ๐๐ง๐ ๐๐ง ๐๐๐ฅ๐๐ฆ๐๐ง๐ฒ๐)
Tak perlu risau leasehold makin susut nilai.
6๏ธโฃ ๐๐๐ญ๐ข๐๐ฉ ๐๐ง๐ข๐ญ ๐๐๐ ๐๐๐ซ๐ฉ๐๐ซ๐ค ๐
Kuantan bukan KL, parking sangat penting.
7๏ธโฃ ๐๐ข๐ฅ๐ข๐ก๐๐ง ๐๐๐ฒ๐จ๐ฎ๐ญ (๐๐ญ๐ฎ๐๐ข๐จ & ๐๐ฎ๐๐ฅ-๐๐๐ฒ)
๐ Dual-key = 2 income stream
๐ Lebih fleksibel untuk sewa
โ ๏ธ Penting
Project ini ๐๐๐๐๐ ๐จ๐๐๐ข๐๐ข๐๐ฅ ๐ฅ๐๐ฎ๐ง๐๐ก
๐ Masuk awal = lebih banyak pilihan unit terbaik
Jangan tunggu sampai unit Seaview habis. Tanya dulu..
# # ๐ฅDownload ๐๐ซ๐จ๐ฌ๐ฎ๐ซ: https://wa.link/vq0amj
# # ๐ฅ๐๐ก๐๐๐ค ๐ค๐๐ฅ๐๐ฒ๐๐ค๐๐ง: https://wa.link/vq0amj
26/02/2026
2026ๅผๅทฅๅคงๅ๐งง #ๅฐไบง
Is ECRL Bosskuโs Project?
Short answer: It depends what you mean by โcredit.โ
If we look at the facts and timeline of the East Coast Rail Link (ECRL):
1๏ธโฃ Who initiated it?
โข The ECRL was proposed and signed in 2016 under the administration of Najib Razak (often referred to as DSNR).
โข It was part of his broader Belt and Road Initiative cooperation with China.
โข The original cost was around RM65 billion.
๐ So in terms of launching and signing the project, yes โ it happened during Najibโs tenure.
2๏ธโฃ What happened after?
โข In 2018, when Mahathir Mohamad returned as PM, the project was suspended.
โข It was later renegotiated, with the cost reduced significantly (to around RM44 billion).
โข Alignment changes were made (e.g., realignment through Negeri Sembilan instead of Bentong).
๐ So the continuation and restructuring happened under a different administration.
3๏ธโฃ Who completes it?
โข Construction continued under multiple governments (PH, PN, Unity Government).
โข The project is expected to be completed in phases around 2026โ2027.
๐ Infrastructure projects of this scale usually span multiple political terms, so different administrations contribute to its ex*****on.
โธป
๐ค So should ECRL be credited to DSNR?
๐ญTechnically:
He can be credited for initiating and signing the project.
โ
Realistically:
The final version of ECRL (route, cost, structure) is the result of multiple governmentsโ decisions.
Large national infrastructure projects are rarely the work of just one leader โ they evolve over time.
Click here to claim your Sponsored Listing.
Category
Contact the business
Website
Address
A9 Jalan Setali 6/2, Jalan Haji Ahmad
Kuantan
25300