Photos from Hartamas Engineering's post 17/03/2026

Column Cladding Completed – Shaw Centrepoint Klang

Alhamdulillah, team kami baru sahaja siapkan kerja ACP column cladding di:

πŸ“ Shaw Centrepoint, Klang
πŸ“ Lower Ground Floor

Project ini melibatkan pemasangan woodgrain finish Aluminium Composite Panel (ACP) pada column concrete untuk upgrade rupa ruang mall supaya nampak lebih modern, kemas dan premium.

βœ” 9 round columns + 1 square column
βœ” Approx 110mΒ² ACP cladding area
βœ” 4mm ACP with PE core
βœ” Wood grain PVDF coated aluminium finish
βœ” Custom curved panel untuk round column
βœ” Aluminium base trim finishing

Semua kerja melibatkan fabrication, cutting, grooving dan installation ACP panel dilakukan oleh team kami sehingga siap dengan finishing yang kemas.

Hasilnya sekarang ruang Lower Ground Floor Shaw Centrepoint nampak jauh lebih clean, premium dan sesuai untuk retail environment.

Jika anda ada projek seperti:
β€’ ACP Column Cladding
β€’ ACP Wall Cladding
β€’ Aluminium Feature Wall
β€’ Mall / Shop Renovation

πŸ“² PM atau WhatsApp kami untuk quotation : 019-297 8384
Team kami boleh handle projek mall, commercial building & shop lot renovation.

17/03/2026

Project Completed – Stainless Steel Handrail Installation

Alhamdulillah, another project successfully completed by our team.

πŸ“ Project Location: Shaw Centrepoint - Klang
πŸ“ Scope: External Walkway & Staircase Stainless Steel Railing Installation

This project involved the supply, fabrication and installation of stainless steel handrail for the raised outdoor walkway and staircase access area.

Project details:
β€’ Approx. 54 meters total stainless steel railing installed
β€’ 50mm diameter Stainless Steel Handrail
β€’ Mild steel balustrade structure with powder coated finish
β€’ Heavy duty base plate with anchor bolt fixing to RC slab
β€’ Installation along external raised walkway and staircase access

Scope of work carried out by our team:
βœ” Site measurement & layout marking
βœ” Core drilling and anchor bolt installation
βœ” Stainless steel handrail welding & fitting
βœ” Base plate alignment and fixing
βœ” Cement grouting & finishing works

Handrail ini dipasang untuk meningkatkan keselamatan pengguna tangga dan laluan pejalan kaki, selain memberi clean modern finishing pada building faΓ§ade.

Terima kasih kepada pihak client dan main contractor atas kepercayaan kepada team kami untuk menyiapkan kerja ini.

Jika anda memerlukan contractor untuk kerja seperti:
β€’ Stainless Steel Handrail
β€’ Metal Railing
β€’ ACP Cladding
β€’ Aluminium & Architectural Metal Works

πŸ“ž Contact us untuk quotation atau project inquiry :
019-297 8384

Want your business to be the top-listed Contractor in Klang?
Click here to claim your Sponsored Listing.

Telephone

Address


No. 30, Jalan Sambau 15b, Taman Bayu Perdana
Klang
41200