Green dot Complete Management Solution
Our 15 year of industrial and Retail expertise says day to day companies are facing certain serious issues such as
•Reduced profitability
•Un management and over inventory
•Retention and performance of people is challenged
•Underutilisation of the resources
•Lack of strategic business
•Sales getting hampered or dealing with reduced margin
•Raw material rates, Salary and other expenses are increa
27/04/2026
From Concepts to Shopfloor Action | 5S Consultancy 🧱📋
The 5S Consultancy program was conducted for a Concrete Block Machinery manufacturer, translating workplace organization concepts into practical implementation plans.
The session focused on visual management, workplace layout structuring, and standardization techniques — enabling teams to build a more controlled, efficient, and audit-ready environment.
Clarity in workplace leads to clarity in performance.
25/04/2026
Workplace Transformation Begins with People | 5S Consultancy ⚙️👥
The 5S Consultancy initiative was rolled out across the shopfloor for an Electric Motors & Drive Solutions manufacturer, engaging the entire workforce in workplace discipline.
The focus was on creating awareness, standardizing work areas, and building ownership among operators — ensuring that cleanliness, order, and efficiency become a daily habit, not a one-time activity.
When everyone aligns, improvement sustains.
21/04/2026
Driving Equipment Reliability | TPM Consultancy 🔧📈
The TPM Consultancy initiative was conducted for a Cable & Wire manufacturer with a strong focus on improving machine effectiveness and operational reliability.
Through structured sessions on OEE, breakdown analysis, and operator ownership, the engagement enabled teams to shift from reactive maintenance to a preventive and performance-driven culture.
When machines perform better, businesses grow faster.
20/04/2026
Shopfloor Discipline in Motion | 5S Consultancy ⚙️🏭
The 5S Consultancy engagement was actively driven at the shopfloor level for a Gears & Transmission Equipment manufacturer, focusing on real-time workplace organization and control.
The intervention emphasized point-of-use storage, reduction of search time, and maintaining defined work zones — enabling smoother operations and higher workforce efficiency.
Efficiency begins where disorder ends.
Click here to claim your Sponsored Listing.
Contact the business
Telephone
Website
Address
69, Ishan Park Society, Dharampur Cross Road, Valsad, Atak Pardi
Valsad
396001
Opening Hours
| Monday | 8am - 5pm |
| Tuesday | 8am - 5pm |
| Wednesday | 8am - 5pm |
| Thursday | 8am - 5pm |
| Friday | 8am - 5pm |
| Saturday | 8am - 5pm |