23/05/2024
Big tiling job in Salcombe, exterior.. getting the concrete base pumped in and finished with minimal falls and flat enough for tiles was the first challenge…. Then using rapid set in the sun 😬👀 dodging showers and then about 30 steps to tile so fiddly 🫣😩🤯 but cracked the back of it now another few days and should be ready for the glass balcony and timber cladding
25/08/2023
Fabric and concrete done ready for paving 👍😃