One Stop Electrical Solutions

One Stop Electrical Solutions

Share

Photos from One Stop Electrical Solutions's post 07/12/2025

Full rewire of property followed by a bathroom refurbishment

Photos from Poulter Property Services Ltd's post 20/05/2025
Photos from Skin King Ltd's post 01/01/2025
Harrogate Project, completed ✔️

Duration - 10 weeks ⌛

This property hadn't been touched for a number of years, it had damp, structural issues, insufficient insulation and very dated interiors.

After stripping it back to a bare shell, we rectified the damp and structural issues, made internal layout changes, completed a full rewire, repiped for new radiators, insulated, borded and fresh plater throughout, followed by second six fix of all joinery and new internal doors. 

Main focus was the disfunctional kitchen. Relocating this into the dining room and opening up the stairs to maximise the space, not only created a much more user friendly and inviting kitchen/dining room but also allowed for a downstairs wc/utility room. 

Although small, swapping the bath for a large walk in shower with brass fixtures and a mixture of modern tiles has totally transformed this bathroom.

This project has been part of a collaboration with @hostandstayuk and we have now handed over to their interior design team @styleduk to complete the decoration and fit out with soft furnishings. We can't wait to see the finsihed product.

As always, a massive thanks to our incredible renovation team for bringing this all together.

Rip out & Joinery - Eric Moody Joinery & Building Solutions

Plumbing & Heating - Redcar Plumbing & Building Services

Electrics - Onestop Electrical

Plastering - BD Plastering

Tiling - Teesside Tiles 

Onto the next one... 
Team B&D 🤝 29/11/2024

Nice project to work on all electrical works by One Stop Electrical Solutions

Harrogate Project, completed ✔️ Duration - 10 weeks ⌛ This property hadn't been touched for a number of years, it had damp, structural issues, insufficient insulation and very dated interiors. After stripping it back to a bare shell, we rectified the damp and structural issues, made internal layout changes, completed a full rewire, repiped for new radiators, insulated, borded and fresh plater throughout, followed by second six fix of all joinery and new internal doors. Main focus was the disfunctional kitchen. Relocating this into the dining room and opening up the stairs to maximise the space, not only created a much more user friendly and inviting kitchen/dining room but also allowed for a downstairs wc/utility room. Although small, swapping the bath for a large walk in shower with brass fixtures and a mixture of modern tiles has totally transformed this bathroom. This project has been part of a collaboration with @hostandstayuk and we have now handed over to their interior design team @styleduk to complete the decoration and fit out with soft furnishings. We can't wait to see the finsihed product. As always, a massive thanks to our incredible renovation team for bringing this all together. Rip out & Joinery - Eric Moody Joinery & Building Solutions Plumbing & Heating - Redcar Plumbing & Building Services Electrics - Onestop Electrical Plastering - BD Plastering Tiling - Teesside Tiles Onto the next one... Team B&D 🤝

Want your business to be the top-listed Contractor in Redcar?
Click here to claim your Sponsored Listing.

Category

Telephone

Website

Address


Redcar
TS102