Round table construction
01/02/2026
recent job completed in
old suite removed and disposed.
walls & ceiling plastered and spotlights fitted.
boxing built for concealed cistern and seating area made in shower area.
60x60 tiles to shower area and floor , 20x20 feature tiles to boxing.
curved bath with mosaic tiled pannel.
1200 wallhung twin basin with vanity unit.
like and share please guys Round table construction
as 2025 comes to an end we look back over the year and are hoping 2026 brings much of the same. We've gotten to meet some lovely customers and have made friends along the way.
we really appreciate the likes & shares that you've all support the page with and as always any works needed feel free to get intouch.
We dont just do bathrooms even though it seems that way 👀
-We're Gas safe registered for all your boiler needs and offer supplied & fitted packages.
-Boiler servicing, Gas safety certificates.
-Kitchens supplied & fitted
-Electrical works
-Plastering and rendering
-Flooring
plus we do take on full house refurbishment where we'll sort out all trades and products required.
again thank you to everyone who's been a customer this year and hopefully we'll see you for jobs again.
From everyone Round table construction happy new year.
07/12/2025
room 1 of 3 completed in Radyr.
old suite removed and disposed.
room plastered.
new spotlights and extractor fan
boxing built for bath alcove and wall stud built for shower enclosure & alcove.
low level 1700 x 800 shower tray
wall hung basin vanity unit, tall storage unit.
led mirror.
like and share please guys Round table construction
Click here to claim your Sponsored Listing.
Telephone
Website
Address
10 Alexandra Road Treforest
Pontypridd
Opening Hours
| Monday | 7am - 5pm |
| Tuesday | 7am - 5pm |
| Wednesday | 7am - 5pm |
| Thursday | 7am - 5pm |
| Friday | 7am - 5pm |