Groupwork
29/10/2025
Stone Demonstrator, London (2025)
We are thrilled to share that the Stone Demonstrator is now installed at the Earl’s Court Development site in London — a three-storey public prototype demonstrating how stone and timber are sustainable alternatives to reinforced concrete and steel in structural frames.
The construction industry accounts for 40% of the world’s carbon emissions – we must radically rethink how we build. This project presents a viable and ethical alternative: a frame like this has around 90% less embodied carbon than steel or reinforced concrete. All new buildings could be built with similar structural principles and materials, paving the way for a much more sustainable future.
The Stone Demonstrator was funded by Future Observatory – the national research programme for the Green Transition — and designed by GROUPWORK and in collaboration with a long list of suppliers and contractors.
Client: Future Observatory at
Site partner:
Funder: The UKRI Arts and Humanities Research Council
Architect: GROUPWORK
Engineers: and
Principal contractor:
Stone structure:
Hybrid stone and timber floor plate:
Dowel-laminated timber floor plate: IQ Wood
Structural stone suppliers: , Carrière de Luget, , , SigmaRoc
Stone brick facade: ,
Stone installation: Ryker Structures
Facade timber supports: Rossmore Contracts
Stone brick garden wall and seating:
Brick layers: Bishops Facades
Landscaping: Lyndon Osborn
Lighting: , .lighting,
Electrical installation:
Photography: Bas Princen
29/10/2025
Click here to claim your Sponsored Listing.
Category
Contact the business
Website
Address
15a Clerkenwell Close
London
EC1R0AA
Opening Hours
| Monday | 9am - 6pm |
| Tuesday | 9am - 6pm |
| Wednesday | 9am - 6pm |
| Thursday | 9am - 6pm |
| Friday | 9am - 6pm |