Multibeam

Multibeam

Jaa

22/12/2025

MULTIBEAM PROJECT:

•⁠ ⁠Client: Kruunusillat Alliance (YIT Suomi Oyj)

Description:
o Temporary pedestrian bridge spanning 140 linear meters over Sörnäisten Rantatie in Helsinki.

o Tunnel-shaped design with rigorous structural calculations for wind, snow, and regulatory compliance.

o Meets all local building regulations for pedestrian infrastructure.

o The bridge’s load capacity was sufficient to allow snow removal to be carried out mechanically when necessary

o 2022-2023 During the construction work, a temporary Näkinsilta bridge, designed and built with a multibeam structure, served pedestrians and cyclists.

Oma Yritys listan huipulle Laitteisto Vantaa :ssa?
Klikkaa tästä saadaaksesi sponsoroidun listauksen.

Osoite


Juhanilantie 4
Vantaa
01740