High-efficiency engineering for a sustainable future. Bio Mobitek - BIO HEATING TECHNOLOGY. We are an engineering company with Estonian capital, established in 2012, producing boiler systems running on biofuel. The production range includes industrial bioboiler houses IndustrialCont, PowerCont, PelletCont with a capacity of 150 kW - 5 MW and stationary bioboiler houses with a capacity of 150 kW -
It is strangely hypnotic to watch the full cycle of a Bio Mobitek plant - starting with a perfect burn, moving through the heart of the boiler house, and finishing with the silo being topped up. Functional engineering that looks as good as it works.
20/04/2026
Lugesime Postimees veergudelt, et meie biokütusel töötav katlamaja on selle aasta Maamess’i üks kõige vingemaid eksponaate. Oleme täitsa nõus – see on ikka päris võimas elukas!
https://www.postimees.ee/8453533/maamehed-saabuvad-moodsa-rasketehnikaga-ulikoolilinna-piirama
Kas teadsid? Tartu Näitused korraldatav Maamess on suuruselt teine mess (kohe pärast Vilniuse raamatumessi), võõrustades üle 40 000 külastaja. See teeb Tartust tõelise regiooni innovatsioonikeskuse ja kohtumispaiga!
Suur-suur tänu ka Georg Noorile ja tema transporditiimile. Meil on alati hea meel tema teenust kasutada – mehed teavad täpselt, kuidas selline hiiglane õigeks ajaks ja turvaliselt kohale toimetada. 🚛💨
📍 Tule astu läbi! Oleme väljas platsil VP-102 ja ütle tere meie tiimile - Märt Jõesaar, Oleg Golmakov, Voldemar Nellis, Aivar Jegorov, Jouni Kanerva ja Fredrik Ahlström. Kohtumiseni! 👋
Maamehed saabuvad moodsa rasketehnikaga ülikoolilinna piirama Eesti suurim ja menukaim mess, uue nädala teisest poolest Tartus algav kolmepäevane maamess toob küllap tänavugi kohale kümneid tuhandeid huvilisi, aga selleks, et neil oleks, mida uudistada, on tulnud osalejatel näha juba selle nädala algusest kaelamurdvat ja pahatihti ka kulukat vaeva.
08/01/2026
A new biomass boiler plant has been completed in Halinga, Estonia 🇪🇪
The project consists of two 750 kW biomass boilers and a 1 MW gas-fired backup boiler. The boiler plant was fully manufactured in modular form at the Bio Mobitek factory and installed at a new biogas production plant currently under construction.
The fuel storage has a capacity of up to 200 m³ and is designed for fuel loading with a front loader, fully aligned with the customer’s requirements.
The boiler plant is now fully completed and ready for operation. We are awaiting the completion of the biogas plant construction, after which Bio Mobitek will proceed with commissioning and start-up.
Biomass energy is more than just heat — it is a step toward a cleaner future, smarter use of local resources, and reduced dependence on fossil fuels. By turning renewable bioenergy into reliable heat, we contribute to sustainable industry, lower emissions, and the preservation of our planet for future generations.