KP Construction Design-Build
10/16/2019
Townhouse renovation continues: master bathroom update from floor to ceiling: walk-in shower, free-standing bathtub, and new plumbing fixtures.
10/12/2019
Another bathroom completed as a part of the entire townhouse renovation.
09/11/2019
Recently completed project: kitchen, living room and entry hall. Slide 👉 to the end to see what it looked like before renovation.
04/04/2019
The North York Bathroom Reno is completed. Swipe to the left ⬅️ to see the final result. This tiny bathroom looked even smaller with the old alcove bathtub and lack of sufficient lighting. The old tub has been replaced with a walk-in shower separated by a glass panel. A bright linear lighting fixture on the ceiling replaced the old wall sconce. This brought enough light into the room. One colour tiles throughout the floor make the room feel larger that it actually is. The large mirror from the top of the vanity to the ceiling expands the room even more.
@ North York
Click here to claim your Sponsored Listing.
Category
Telephone
Website
Address
2-18 Cathedral High Street
Markham, ON
L6C0P2
Opening Hours
| Monday | 9am - 6pm |
| Tuesday | 9am - 6pm |
| Wednesday | 9am - 6pm |
| Thursday | 9am - 6pm |
| Friday | 9am - 6pm |
| Saturday | 9am - 3pm |