Light-weight Building Systems Inc.

Light-weight Building Systems Inc.

Share

Photos from Light-weight Building Systems Inc.'s post 02/27/2026

Details matter especially in high-density urban environments where space is limited and complexity is high.

This project pushed both design and construction coordination to the next level. Built within a tight urban footprint, every square foot required deliberate planning, disciplined sequencing, and precise ex*****on.

The structure features a load-bearing steel stud system integrated with a composite floor assembly, along with precast and cast-in-place balconies below. Numerous overhangs, step-ins, occupied roof areas, cantilevers, and pop-up roof elements introduced significant structural and detailing complexity.

The real challenge was in the transitions where systems intersect and geometry shifts. These critical junctions demanded rigorous engineering, meticulous detailing, and coordinated site ex*****on.

In complex projects like this, precision defines success.

We’re proud of the team for embracing the technical demands and delivering a high-quality result by staying focused on the details.

December 2025 Newsletter - Light-weight Building Systems 12/04/2025

We’re pleased to share the December 2025 edition of the LBS Newsletter. In this issue, we highlight meaningful milestones from our team and project sites, including a special celebration of Kidus Kebede’s P.Eng. designation — a noteworthy achievement that reflects his dedication and the strength of our engineering practice.

You’ll also find project updates from Duncan, Courtenay, and Kamloops, where LBS continues to support safe, efficient, and consistent construction across Canada.

Thank you for being part of our community. We look forward to keeping you connected with more progress and stories as we continue building smarter and better together.

December 2025 Newsletter - Light-weight Building Systems We’re pleased to share the December 2025 edition of the LBS Newsletter. In this issue, we highlight meaningful milestones from our team and project sites, including a special celebration of Kidus Kebede’s P.Eng. designation — a noteworthy achievement that reflects his dedication and the streng...

07/28/2025

💬 𝖶𝖾’𝗏𝖾 𝗐𝗈𝗋𝗄𝖾𝖽 𝗐𝗂𝗍𝗁 𝖫𝖡𝖲 𝗈𝗇 𝗌𝖾𝗏𝖾𝗋𝖺𝗅 𝗉𝗋𝗈𝗃𝖾𝖼𝗍𝗌 𝖺𝗇𝖽 𝗁𝖺𝗏𝖾 𝖻𝖾𝖾𝗇 𝗋𝖾𝖺𝗅𝗅𝗒 𝗂𝗆𝗉𝗋𝖾𝗌𝗌𝖾𝖽 𝗐𝗂𝗍𝗁 𝗍𝗁𝖾𝗂𝗋 𝖼𝗈𝗈𝗋𝖽𝗂𝗇𝖺𝗍𝗂𝗈𝗇 𝖺𝗇𝖽 𝖾𝗑𝖾𝖼𝗎𝗍𝗂𝗈𝗇. 𝖨’𝗆 𝖺 𝖻𝗂𝗀 𝖺𝖽𝗏𝗈𝖼𝖺𝗍𝖾 𝖿𝗈𝗋 𝗈𝖿𝖿𝗌𝗂𝗍𝖾 𝗉𝗋𝖾𝖿𝖺𝖻𝗋𝗂𝖼𝖺𝗍𝗂𝗈𝗇 𝖺𝗇𝖽 𝗉𝖺𝗇𝖾𝗅𝗂𝗓𝖾𝖽 𝖼𝗈𝗇𝗌𝗍𝗋𝗎𝖼𝗍𝗂𝗈𝗇, 𝖺𝗇𝖽 𝖫𝖡𝖲 𝗁𝖺𝗌 𝗌𝗁𝗈𝗐𝗇 𝗁𝗈𝗐 𝗆𝗎𝖼𝗁 𝖾𝖿𝖿𝗂𝖼𝗂𝖾𝗇𝖼𝗒 𝖺𝗇𝖽 𝗍𝗂𝗆𝖾 𝗌𝖺𝗏𝗂𝗇𝗀𝗌 𝗂𝗍 𝖼𝖺𝗇 𝖻𝗋𝗂𝗇𝗀 𝗐𝗁𝖾𝗇 𝖽𝗈𝗇𝖾 𝗋𝗂𝗀𝗁𝗍. 𝖫𝗈𝗈𝗄𝗂𝗇𝗀 𝖿𝗈𝗋𝗐𝖺𝗋𝖽 𝗍𝗈 𝗆𝗈𝗋𝖾 𝗉𝗋𝗈𝗃𝖾𝖼𝗍𝗌 𝗍𝗈𝗀𝖾𝗍𝗁𝖾𝗋.
— 𝘛𝘰𝘯𝘺 𝘒𝘪𝘳𝘴𝘤𝘩𝘴𝘵𝘦𝘪𝘯 𝘚𝘮𝘪𝘵𝘩, 𝘒𝘚𝘮𝘪𝘵𝘩 𝘊𝘰𝘯𝘴𝘵𝘳𝘶𝘤𝘵𝘪𝘰𝘯

-
It’s always an honor to receive feedback from our clients!😊

We've had the pleasure of working with Tony on multiple projects, including the recently completed Tresah West—a 12-storey, 179-unit condominium located in Victoria’s Midtown.

Built using LBS’s non-combustible systems, Tresah reflects our commitment to speed, safety, and long-term value. Thank you Tony for your trust and collaboration!

Tresah is a great example of what’s possible when innovation meets collaboration.

Want your business to be the top-listed Engineering Company in High River?
Click here to claim your Sponsored Listing.

Telephone

Address


911 20 Street S. E
High River, AB
T1V2A6

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm