MJ-Works
18/03/2026
Finished the oil circuit connecting the new oil tank and the engine using AN hoses and fittings. There is a valve in there that makes sure the oil doesn’t flow to the engine when it’s not running or it would slowly fill up the sump. Also started work on the rear subframe to house the Li-ion battery and other electronics. Work has been halted for a while (pictures are at least 10 days old) but I’m going to try and have a testride before the end of this month…wish me luck 😉
25/01/2026
Started work on the oil tank and on the first designs of the fuel tanks. Design 4’ has around 25L in total. First up is finishing the oil tank and hose routing. More to follow…😉
10/01/2026
Finished the exhaust on the
All welded and added a rubber mounted support behind the right footpeg. Had to redo a part because of too little clearance to the swingarm when the suspension was fully extended. Rookie mistake…😜
But now it’s even better than before so happy with it! On to the next part of the build!
Klik hier om uitgelicht te worden.
Website
Adres
Antwerp