TESVOLT AUSTRALIA

TESVOLT AUSTRALIA

Share

Nearby engineering companies

BYD B
BYD B
22 Olga Road, Maddington

TESVOLT now has a branch of technical specialists in Australia (at our Perth Office WA) ready to service the growing demand for energy storage systems nation wide.

Photos from TESVOLT AUSTRALIA's post 03/12/2025

🌱 Powering a Sustainable Energy Future for Overstory’s Wayfinder Winery with TESVOLT

Unlimited Energy Australia is proud to announce the successful commissioning of the first stage of the Wayfinder Winery & Farm renewable energy system, a key milestone in Overstory’s long term vision for a fully off grid, sustainable estate in Margaret River.

Since 2022, Overstory has partnered with Unlimited Energy Australia to transform an ambitious idea into a technically robust, efficient renewable energy strategy. Our team led the pre-feasibility, full feasibility and Stage 1 detailed design, designing the optimal renewable energy system for the estate’s operations.

Our renewable energy system includes:
☀️302 kW / 300 kW Solar PV array
🔋240 kW / 240 kWh German designed and manufactured TESVOLT Battery Energy Storage System - German engineered, reliable and built for longevity.

This system, now fully commissioned, provides Wayfinder with reliable, clean power to support vineyard operations, winery production and the estate’s planned hospitality facilities.

This project is a strong example of how our renewable energy solutions help clients achieve long term sustainability and energy independence.

The full story, including technical insights and the pathway to energy independence, is now live on our website.

➡️Read the full article: https://ow.ly/NjSW50XB64w

Photos from TESVOLT AUSTRALIA's post 04/06/2025

⚡Off-grid. Carbon neutral. Fully operational.

That’s what we delivered at Rocky Ridge Brewing Co in Jindong Western Australia, and it’s a showcase of what Tesvolt Australia and Unlimited Energy Australia do best.

We partnered with Innovative Energy Systems to design and deliver a complete off-grid renewable energy solution, with a second project expansion now complete.

Together we installed:
🔋320kWh TESVOLT HV 80E Energy Storage System
🔌SMA Sunny Tripower X Inverter technology
☀️200kW solar array

The results
✅ 250 000 kWh annual energy yield
✅ Saving 165 tons of CO₂ annually (that’s 450kg per day!)
✅ A scalable system designed for growth and operational independence

No grid upgrades. No long delays. Just smart, modular, reliable clean energy that enables businesses to lead with sustainability and efficiency, even in remote location.

As more regional businesses face energy infrastructure challenges, this project shows what’s possible with the right partners and technology.

Sustainable industry isn’t the future. It’s already here!

For more information about this project: https://ow.ly/rSus50W3Png

Want your business to be the top-listed Engineering Company in Perth?
Click here to claim your Sponsored Listing.

Category

Telephone

Address


Perth, WA
6005

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm