Williams Construction WA

Williams Construction WA

Share

Photos from Williams Construction WA's post 13/03/2026

Fresh stairs in Bayswater wrapped up ready for the painter to fix it.

Photos from Williams Construction WA's post 09/01/2026

Stirling kitchen and laundry renovation complete.

Start to finish- 5 weeks, including stone.

Last slide for before photos.

Main scope -
Removed existing walls and ceilings.
Supply and install all joinery with stone bench tops and splash backs.
Electrical pre wire and fit off.
External range hood motor mounted.
New walls, cavity slider leading into pantry, new cornice.

Photos from Williams Construction WA's post 09/12/2025

Still chipping away in Coolbinia for repeat customer, finishing off their outdoor area with new joinery. Grateful for customers like this 🤝🤝

End slide is a before photo.

09/12/2025

JH axon feature cladding in Caversham wrapped up for

Photos from Williams Construction WA's post 05/10/2025

Small cabana done in Kapur for a mediocre mate.

Photos from Williams Construction WA's post 02/09/2025

“Best sheds” install wrapped up in Woodvale. 💅

Photos from Williams Construction WA's post 12/08/2025

Been slow on the posts - here’s an update.

Enclosed this garage in Pearsall.

WCWA x

Stud frame and axon cladding
2 doors
Painted internally and externally
4.5 CFC sheeting internally
New roller door

Photos from Williams Construction WA's post 03/07/2025

Carine kitchen complete - I’m a moose on the before photos but works included -

Removal of existing brick structures & re supporting roof and ceiling
Demo of existing kitchen
Supply and install of cabinetry, bench tops and backs

Photos from Williams Construction WA's post 12/06/2025

Axon cladding completed for our friends
Always nice to see it all finished up 🤝

Photos from Williams Construction WA's post 19/03/2025

Coolbinia Renovation 💥

Had the opportunity to work on this beautiful home in Coolbinia, and modernising it with some heritage features.

Old fibreglass strapped ceilings removed and replaced with modern materials, matching and replacing the original cornices.

Media wall, with inbuilt niches with v groove panelling on the backs, LED lighting built it to the shelving.

2 pac painted shelves and joinery.

Walk in robe joinery, linen press joinery.

Half height wall panelling with dado rail throughout.

Pivot door to WIR.

Mantle 2 pac painted with stone on top and under.

Photos from Williams Construction WA's post 13/03/2025

Mount Lawley extension / patio ready for paint and electrical 🤝🤝🤝

Deleted old patio
150mm posts
180 x 45 rafters
R4 195mm insulation batts installed.
Sarking under tin
Aquachek ceiling
Pre-wired for fans and downlights.
Trim dek colourbond sheeting, matching Manor red gutters and downpipes.
Council approved and engineered.

Want your business to be the top-listed Contractor in Perth?
Click here to claim your Sponsored Listing.

Category

Address


Perth, WA
6000