Photos from APT- Mini Excavation Division's post 07/07/2026

East keilor stage 1-
2 driveways, pathways prepared ong with all surplus soil removed. We encountered some old fence strip footings which we also removed.
We will be back to do 2x crossovers and removal of all the existing footpath ready for re-instatement.
2tonne excavator, kanga and hino mini tipper worked great on this project!

Photos from APT- Mini Excavation Division's post 03/06/2026

Melton Childcare centre:
400m2 of concrete base preparation
3 tonne excavator and kanga loader worked perfectly on this one
30m3 of class 3 rock installed to height ready for the concrete crew to complete!
Big thanks to Mr James for the ongoing work!

Photos from APT- Mini Excavation Division's post 29/04/2026

Hillside for another of our regular concreters VV Concrete
Removal of existing driveway and preparation of driveway extension, car park bay and crossover extension
Big thanks to my crew for as always leaving the site neat and tidy!

Want your business to be the top-listed Contractor in Melbourne?
Click here to claim your Sponsored Listing.

Category

Telephone

Website

Address


7 Somers Parade, Altona
Melbourne, VIC
3018