East keilor stage 1-
2 driveways, pathways prepared ong with all surplus soil removed. We encountered some old fence strip footings which we also removed.
We will be back to do 2x crossovers and removal of all the existing footpath ready for re-instatement.
2tonne excavator, kanga and hino mini tipper worked great on this project!
03/06/2026
Melton Childcare centre:
400m2 of concrete base preparation
3 tonne excavator and kanga loader worked perfectly on this one
30m3 of class 3 rock installed to height ready for the concrete crew to complete!
Big thanks to Mr James for the ongoing work!
29/04/2026
Hillside for another of our regular concreters VV Concrete
Removal of existing driveway and preparation of driveway extension, car park bay and crossover extension
Big thanks to my crew for as always leaving the site neat and tidy!