Silagy Contracting LLC
07/31/2020
Pavers done right. 4 1/2” of crushed concrete, 1 1/2 of sand, then the pavers. All elevations screeded and fine tuned with a laser. Here we are installing some pavers from Cambridge. Cambridge Toffee Onyx and Sahara Chestnut. Keeping it simple for this job.
05/06/2020
Another group of photos from our total site development at James Madison Intermediate School. After we poured about 40 yards of strip footings for the mate lines of the modulars, we began the pour of the 13,000 square foot concrete slab @ James Madison Inter
A bit of a to our morning. This Case 590 is just creeping up on 7,000 hours
02/04/2020
Full depth excavation for an asphalt patch. Replaced with a high grade v***r barrier, DGA, and two layers of asphalt for our long time client, Heller Industrial Parks.
Click here to claim your Sponsored Listing.
Website
Address