BlueMaxx Contracting LLC
04/14/2022
While I'm at it...I finished a bunch of other stuff too...
01/12/2022
So, now I'm on to all the little stuff... grout, molding etc... this light box was an after- thought though... which in hindsight is the worse kind of idea lol... but I managed to make it work... still has a few more finishing touches to be done.
01/12/2022
So... new year and I finally got around to tackling this bathroom floor. Because I'm dealing with a compound slope I had to get creative leveling the surface for the Teak shower floor. My final solution was 3/8 hex lag bolts, bolt wedge anchors, pex tubing... and a whole lot of patience. The result was a perfect fit and level x & y.
12/02/2021
I finally finished the build in cabinet... roughly 200 hrs, some 500 pieces... and lots of elbow grease... pine and cedar with a cognac stain and satin finish.
09/18/2021
A little progress update on the deck...2 days (14 hrs)...tbc on Tuesday...I seriously pride myself on building the safest decks possible for clients... absolutely impairative.
Click here to claim your Sponsored Listing.
Category
Contact the business
Website
Address
Cheyenne, WY
82001