جانب من ألاحتفال بمناسبة انتهاء فعاليه التسليك التي تعتبر من اكبر الفعاليات في مشروع خط الناقل العلوي المرحله الثانيه وتعتبر من الفعاليات عاليه الخطورة وتم تكريم جميع موظفين الشركة بشهادات تقديرية على الجهود التي بذلوها لنجاح المشروع

Photos from ARD Group Company's post 16/11/2022

ROO company visited our company to follow up on the progress of the OHTL PHASE2 project and praised the achievements that took place in the course of work.

Photos from ARD Group Company's post 23/03/2022

Our company has completed works of the first stage of the Overhead transmission line Ring main 01& 02 PHASE 01(OHTL) Project in North Rumaila, the activities have done as :
Site surveys (route, geographical, and topological).
• All design works (including design of poles and foundations).
• Preparation of right of way.
• Procurement of all material.
• All OHTL installation works including Tower foundations.
• Design, supply, and installation of the foundations for the free-issued Ring-main Connection skid (RMU, transformer, and harmonic filter) located at the well site.
• Installation of the free-issued skid at each ESP well site.
• Electrical connections of the free-issued Ring-main Connection skid with the OHTL.
Cabling to the VSD (Variable Speed Drive) skid.
• OPGW (Optical Ground Wire) Supply, Installation, and Terminations.
• Commissioning & Testing

Want your business to be the top-listed Autos & Automotive Service in Basra?
Click here to claim your Sponsored Listing.

Telephone

Address

Al Muhandiseen District, Near AL Khaleeg Fuel Station , Zubair Street Qibla
Basra
61003