BubbleDeck
Low cost – 35% less concrete
BubbleDeck floors eliminate up to 35% of concrete from suspended slabs. Add further savings from lighter structures, improved productivity and reduced energy consumption and it's easy to see how using BubbleDeck preformed slabs can contribute to a healthy bottom line for construction projects.
19/02/2021
18/07/2014
999 Hay Street moving up fast!
Check out this aerial pic of level 4 - on the left is a concrete pour in progress - just about to cover the last of the bubbles. Bottom right of the photo is another area of BubbleDeck panels being placed on the propping, lifted by the tower crane off the truck just visible in the shadows at the top of the photo.
Not many people needed on the concrete pour - how many can you count up there?
PACT, Qube Property Group & Eames Architects have collaborated on this building of about 11,500 sqm NLA. The BubbleDeck component is about 18,000 sqm.
20/12/2013
Mint view from City Apartments
Located on Hay St just opposite the historic Perth Mint, Au Apartments consists of 192 apartments over 10 levels across two separate towers which are connected by a spacious entertainment deck incorporating solar-heated swimming pool, sauna, gymnasium and lounge facilities.
Finbar Group Limited’s latest city apartment development is rocketing towards completion by taking advantage of the speed of BubbleDeck slabs. The $108million dollar development built by Hanssen Pty Ltd has utilised the BubbleDeck floor system in unison with additional precast component to ensure that Au Apartment achieves fast floor cycles required to deliver the development on time and budget.
Hanssen Pty Ltd is scheduled to complete Au Apartments early in 2014. Learn more about Au Apartments (http://www.auapartments.com.au/)
20/12/2013
New Perth Office Development Underway
December 2013
999 Hay has recently broken ground and is heading at full speed towards the first delivery of BubbleDeck panels.
Moving on from their successful partnership at One 70, PACT Construction are once again in charge of construction on this latest Qube Property Group development. PACT Construction and Qube Property Group have chosen the BubbleDeck system for its large span floor plates, flexibility in retro fitting and ease of construction.
Designed by Eames Architects 999 Hay consists of approximately 11,500sqm of commercial office space with large highly flexible office floor plates, secure vehicle, motorcycle and bicycle parking over two levels and a proposed restaurant at the ground floor level.
999 Hay is scheduled for completion in mid 2015.
Learn more about 999 Hay (http://999hay.com.au/)
19/09/2013
The first Bubbledeck panels were delivered to site at Finbar's Ecco on the 12th April this year and the final pour was on the 13th September.
That is only 5 months to construct the upper basement, ground floor, a five storey tower and six storey tower.
08/05/2013
Shane from PACT and Nick from Aurecon look on as Bubbledeck hits the higher levels at WALGA.
19/04/2013
Builder Dempsey Gillespie has chosen the BubbleDeck voided slab system for use in the new Bluewater seven level luxury residential development located on the beachfront at Scarborough , 10 kilometres west of the Perth CBD.
Bluewater Apartment development is made up of a mix and one, two and three bedroom luxury apartments and split level penthouse house apartments, all with views over the Indian Ocean.
With a focus on speed of construction, the builder is using the BubbleDeck precast system in conjunction with the AFS wall system to ensure fast floor cycles and deliver the building on time. Bluewater utilises a mix of BD280, BD340 and BD450 slabs showing the adaptability of the precast system to meet a variety of structural solutions within the one project.
Placement of Bubbledeck prefabricated panels commenced in late 2012 and will continue until midway through 2013.
To learn more about Bluewater apartments click here[http://www.bluewaterscarborough.com.au/]